Renovation Contractors. Fixed Price. One Team. Done Properly.
Late. Over budget. Impossible to reach.
Three words that shouldn't describe your renovation.
Six in-house trades. One fixed-price contract. One project manager from survey to sign-off. If the price changes, you agreed to it. If the date slips, you hear the day it slips.
★ 5/5 · 3 verified reviews · Free site survey · Quote in 3 working days
Every trade your property needs. All under one roof.
No subcontractors, no finger-pointing, no 'that's not my department'. The same team that quoted the job runs it.
Decorating
Most painters skip the prep. That's why the finish fails six months later. We don't.
Read moreFlooring
A floor that creaks, gaps, or cups within two winters has a subfloor problem. We fix that first.
Read moreKitchen Fitting
A kitchen install is 20% carpentry and 80% project management. Most fitters only handle the 20%.
Read moreBathroom Fitting
Most bathrooms that fail weren't badly tiled. They were badly waterproofed underneath.
Read moreHandyman & Property Maintenance
The jobs nobody else will come out for. We built our calendar around exactly these.
Read moreBuilding Management
Stop fielding tenant maintenance calls at 11pm. One number handles everything.
Read moreFour steps that actually happen in order.
No 'we'll be in touch'. A specific person, a specific calendar slot, a specific start date — and a price that doesn't change between the quote and the invoice.
A real site visit — not a quote by WhatsApp
A senior tradesperson visits the property, measures, photographs, and asks the questions a quote-by-message will always miss. This is how we catch the things that turn into surprises.
A line-by-line price that doesn't change
A written quote with labour and materials both itemised, inside three working days. Not an estimate. Not a range. The number you sign is the number on the invoice.
A real date — not "sometime next month"
Booked into our project calendar before anything is signed. The same project manager runs it from the first visit to the final snag walk-through.
We don't leave until the snag list is empty
We walk the property with you at the end. Anything that doesn't meet the spec gets fixed the same day. You get a written 12-month guarantee before we pack up.

The preparation, the communication, the guarantee — done properly.
Most renovation problems are predictable. Quoted low, charged high. Started late, finished later. Disappeared after the deposit. We've built systems that prevent exactly these — because the problems are always the same.
You deal with one person from the first visit to the final snag. They know the quote, they know the brief, they know the property. You don't get passed around to someone who has no idea what was agreed.
We agree both before anything is signed. If something slips, you hear about it the day it slips — not after you've already rearranged your life twice and the project is already a month late.
Every working day ends with tools off the floor, dust sheets down, materials stacked. We're working in your home, not a factory, and we treat it that way.
The guarantee is almost never used. But when it is, you get the same person who did the original work — not a stranger who doesn't know what was done or why.
£1m public liability insurance.
London and the surrounding areas.
Based in Berkshire, working across London. We travel for the right project — call us if you're not sure we cover your area and we'll tell you honestly.
Tell us about your project.
A free survey, a fixed-price quote, and a real start date — usually inside three working days.


